Login

Railway Track & Base Repair

Railway Track & Base Repair

After saturated conditions weaken a 3 foot thick concrete base under a long span of rail track, URETEK crews work in tight conditions with over 12,000 volts buzzing overhead to stabilize the compromised track using structural grade polymer.

For more information, visit UretekICR

Share and Enjoy:
  • Facebook
  • Twitter
  • Google Bookmarks
  • LinkedIn

Leave a Reply

Your email address will not be published. Required fields are marked *

  • ICRI
  • NSF
  • bayer
  • boma
  • apwa
  • fra
  • asce
  • RSS
  • Linked In
  • Facebook
  • Twitter
  • Youtube

©2017 ©URETEK ICR. All Rights Reserved.